You are here: Home > Case Studies0844 875 1260

Case Studies

Jun
2013
RyeEmb3

River Wye Embankment, High Wycombe

Flooding events within The Rye parkland due to bank failures within the River Wye, caused the local council to seek advice in the form of ECI provided by Land and…” Learn more

May
2013
ingrebourne1

River Ingrebourne Enhancement

The London Borough of Havering consulted with the Environment Agency in order to improve the characteristics of the river over a 1.8 kilometre reach, thereby improving habitat for the local…” Learn more

May
2013
ebley1

Ebley Channel Widening in Stroud

In advance of the ‘Stroud on Water’ event in 2012, Land and Water Services were employed as Principal Contractor by Stroud District Council to dredge and widen the Stroudwater Canal…” Learn more

May
2013
peef3

Lanscaping works at Petersfield, Hampshire

As part of landscaping for a new property at Petersfield, Hampshire, Land and Water’s Private Client Division were asked to carry out extensive works to refurbish a weir, construct oak…” Learn more

May
2013
shere2

New Lake Construction in Shere

Land and Waters’ Private Clients Division were awarded the contract to construct a new two acre lake within the grounds of a vineyard near Guildford. Due to the sandy ground…” Learn more

May
2013
liphook1

Liphook Water Feature and River Works

Land and Water’s Private Clients Division were instructed to carry out refurbishment works to a property at Liphook, Hampshire. The works included reinstatement of the river that runs through the…” Learn more

Mar
2012
BMW Show Room Land & Water Case Study

BMW Olympic Showroom

Land and Water Services Ltd’s intimate knowledge of the waterways around East London and particularly the Olympics were instrumental in their award of the contract from BMW for the installation…” Learn more

Dec
2011
Chichester Vegetation Management by Land and Water Services

Chichester Vegetation Management

As part of their vegetation management framework contract, Land & Water Services undertook maintenance works on specified watercourses in Chichester area. There were two elements to this contract, the light…” Learn more

Dec
2011
Belper Bridge Completion Land & Water Case Study

Belper Bridge Pipeline Replacement

An existing bridge which spans the River Derwent in Belper has contained a sewer within its structure since it was built in 1905. This existing sewer was defective having corroded…” Learn more

Oct
2011
Epping Brent Veg_featured

Epping & Brent Vegetation Management

As part of the Vegetation Management Framework contract held by Land & Water Services, maintenance work was carried out on specified watercourses in both the Epping and Brent areas. Cut…” Learn more