Adobe Reader is required to read these Case Studies, please click here to download a free version.
Please click on the Case Study heading to read about the associated project in PDF format.
Priory Park Lake Works
To Dredge the Lake and Dispose of 7000m³ Silt off Site in a Busy and Historical Park.....
Fosdyke Grid
The remit for this contract was to install a steel mooring platform for the Environment Agencies Cawood Barge.....
Inverness Harbour
Land and Water Services delivered a Dredging Subcontract on behalf of Morrison Construction Ltd. The works were split into three main sections.....
Virginia Water—Lake Construction with liner
To create a formal lake on a slope in sandy clay ground.....
Dredging of the River Lee Navigation
British Waterways were requested by the Environment Agency to dredge approximately 22,000 m3 of sediment from the River Lee Navigation so as to improve water quality. Land & Water were commissioned.....
River Lambourn SSSI Restoration
The contract called for a number of structures to be altered, reconfigured or completely rebuilt to high specifactions.....
Rutland Water
Land & Water Services were contracted by Carrillion to construct an Impoundment Dam to create Lagoon A which forms part of the Rutland Water Habitats Creation Scheme.....
Otmoor Nature Reserve
The original site was a 55 acre arable field purchased by the RSPB to extend and improve their existing wildlife habitat area at Otmoor by carrying out landscape engineering to construct a grassed wetland with water control measures......
A & P Tyne
Land & Water Services were contracted to carry out the maintenance dredging of the entrance to A & P Dry Dock No 2 and the adjacent areas of quayside to a specified profile. The area of dredging was heavily contaminated with Tributyltin (TBT).....
Bone Mill Sluice Gate Refurbishment
The existing timber 3 gate structure had played an important role in alleviating flood risk to the east of the Newbury area.....
Maintenance Dredging of Emsworth Yacht Harbour
The objective for this site was to remove approximately 11,500m3 of silt from within the boundaries of Emsworth Yacht Marina.....
Mercia Marina, Willington
The scheme comprises the design and construction of a £5.4m 620 berth canal marina on the Trent and Mersey Canal.....
Cossington Lock, Tow Path Restoration
The lock approach was composed of York stone blockwork wall and a granite setts footpath, this had become unstable and was slipping into the canal due to floodwater erosion.....
New River Wall, Pier Road, Gillingham
TMS were employed as sub contractors for the whole works with Richard Fairall as Site Manager. TMS removed the existing mooring piles, pontoons and walkways using an 80 tonne crane and heavy duty winching plant.....
Sovereign Harbour
The outer basin at Sovereign Harbour opens into the English Channel and on three sides comprises sloping revetments protected by a concrete-block system.....
Padnall Lake Restoration
Padnall Lake is a balancing pond taking run off from the adjacent A12 as well as a culvert outfall from the neighbouring housing estate.....
River Wye at Cheptow
Discharging into the Severn Estuary the River Wye has a 13m tidal range and, at Chepstow, is throttled between town and cliffs. The rock watershed means that, as rainfall quickly runs off the land, a dangerous river becomes lethal.....
Calcutt Meadow Marina
The client wished to extend the existing marina to accommodate a large increase in demand for narrowboat moorings in the area.....
M1 River Swift
The object of this project was to provide scour protection to an M1 over-bridge a primary asset on the motorway network.....
Five Weirs Walk
This project was the final phase of a scheme to connect Sheffield city centre with the Meadowhall Shopping Centre by creating a riverside walk.....
Folley Bridge - Footpath
The purpose of the works was to re-instate a section of the Thames towpath which had been undermined and to reinforce the abutment on an adjacent footbridge.....
WWT Arundel, Loopway Wetland
The amalgamation of approximately 1/3 of the existing visitor centre at the WWT’s busiest centre in Arundel combined with the creation of 2 acres of reedbed habitat to create a new visitor experience for the general public.....
Martin Mere, Burscough
The project involved the development of 30 ha of arable farmland into natural wetland reedbed habitat.....
Kenwood House
Reconstruction and improvement on ancient dam within the grounds of Kenwood House, Hampstead, London.....
Cusworth Hall - Lake Restoration
The scheme was to restore the original 1909 design of the lakes with funding from the Heritage Lottery Fund.....
Meriden Park - Lake Restoration
The scheme was to restore a 4 acre lake which had become severely silted, with approximately 10,000 m3 of silt and debris. The project design intended to maximize the hydraulic flow through the lake to minimize sediment deposition.....
Gayhurst Park - Lake Restoration
This restoration involved dredging a private estate lake, approx 3 acres in area and containing 10,000 m3 of silt.....
Alexandra Palace Boating Lake
The project objectives were to dredge the lake, stabilise the contaminated sediments with OPC and transport to an area nearby for re-use as landscaping material.....
Cuerden Valley Park Reservoir, Lancashire
The project involved the removal of approximately 10,000m3 of sediment in order to re-establish the viability of the outlet valve within the lake.....
Brockwell Park, Lake Restoration
Working closely with the Wildfowl Wetlands Advisory Service the project objective was to restore three urban ponds within the London Borough of Lambeth.....
Belair Park Landscape Improvements
The scheme involved the restoration of a municipal lake, within the heart of an open park in the London Borough of Dulwich.....
Maintenance Dredging of the Millennium Ribble Link
The works involved the dredging of the Millennium Ribble link, which links the River Ribble to the Lancaster Canal at Preston, Lancashire.....
Bewl Reservoir Pipeline Transfer Scheme
The objective of the Bewl to Darwell Pipeline Transfer Scheme was to lay 3.2km of 500mm diameter water pipe in a trench on the reservoir bed.....
Redgrave Pinsent Rowing Lake
The design of this prestigious sports facility for Sport England called for linking up several redundant gravel pits near Caversham.....
Finsbury Park Boating Lake
The overall Client for the project was the London Borough of Haringey and their project objectives were to dredge the lake, stabilise the sediments with OPC and transport to designated area on site for re-use as landscaping material.....
Regeneration of Beverley Beck
Contamination of the sediments within Beverley Beck was a legacy of industrial activity in the area, resulting in elevated levels of heavy metals and hydrocarbons. The sediments were classified as Special Waste that would ultimately be disposed of in a hazardous landfill.....
CTRL, Contract 320 Excavation of Tunnel Approach Structure
This major sub-contract for the Hochtief J.V. called on Land & Water's core skills of operating long reach plant and conditioning wet difficult wastes prior to disposal.....
Wigg Island Canal Restoration
Wigg Island has been the recipient of much uncontrolled tipping of hazardous waste from chemical industries since the early 1800’s. During this time some of the waste was pushed into the Latchford Canal infilling it and resulting in highly acidic leachate discharging over many years into the truncated canal.....